5 teams shortlisted for stage 2 of the Rail Corridor RFP [Press Release]
20 May 2015 – The Urban Redevelopment Authority (URA) announced today the five teams shortlisted to participate in the second stage of the Rail Corridor Request for Proposal (RFP). The URA also announced further details of the requirements in Stage 2, including a feasibility study and preliminary design for a four kilometre-long signature stretch to be undertaken by the successful team of the Concept Master Plan.
Strong interest in the Rail Corridor project
The URA launched the ‘Rail Corridor – An Inspired and Extraordinary Community Space’ RFP on 18 March 2015, inviting design professionals to develop a Concept Master Plan and Concept Proposals for Singapore’s Rail Corridor.
64 teams responded with their submissions in the Stage 1 Pre-Qualification exercise that closed on 15 April 2015. The teams comprise local and international landscape architectural and architectural firms, including tie-ups between local and international firms. Read more